I have 14 different mowing areas. They take multiple days to cover them all. To keep track of what I have mowed since the last cycle, I use the map custom setting. I start a current cycle by setting the current date. I keep that date, and set the end date to whatever day I am now on. By selecting something like the elevation for the map, it fills in the progress. I don’t always mow in the same order, depending on a bunch of variables. However, each time I finish and go to the next section, the previously set dates are cleared. I would like the settings to be remembered until I reset them.
That goes to a lot fill in things like “store to folder”. It would be nice if it membered what was filled in last.
Thanks for laying out how you use it. For keeping track of a mowing cycle, have you tried the Logbook? Its Jobs list shows every run, newest first, with the date, the plan, the time spent and the area covered. When you start a new cycle, note the date: everything listed after it is done, and any area you don’t see there since then is still to do. The Trip meter on the same page can mark the cycle too. Press Reset trip when you start, and it counts the working hours and distance since.
The map’s custom range is still the way to see it laid out on the map. Having it remember your dates until you change them is a fair point, and we’ll take a look at it.
I am very visual oriented. The map makes it visual and I can see which area bumps into what other area and see how big they are. I would not consider doing it with words in place of a picture, even if it irks me that it gets reset every time. I hope you can make it remember. ![]()